There are many steps and precautions involved in shipping the ALPMD3020 drilling machine to Russia. Before shipping, ensure that all functions of the drilling machine are operating normally and conduct necessary tests and inspections.
Do a good job of cleaning and maintenance. The surface and interior of the equipment should be cleaned, checked and necessary maintenance should be carried out, especially for parts that may affect transportation safety.
1. The ALPMD3020 drilling machine needs to be packed in a reinforced manner when it is shipped to Russia. Since the ALPMD3020 drilling machine is a large and heavy equipment, it needs to be packed in wooden boxes and other sturdy packaging materials to prevent damage during transportation.
2. Protective measures should be taken when the ALPMD3020 drilling machine is shipped to Russia: Use shockproof materials to fill the gaps around the equipment to avoid vibration and collision. To prevent moisture, consider using moisture-proof film or rust inhibitor for treatment.
3. When shipping the ALPMD3020 drilling machine to Russia, choose the appropriate mode of transportation based on the distance to the destination and customer needs. Ensure that the equipment is firmly fixed in the transport vehicle during loading to avoid damage to the equipment due to shaking during transportation.